rdale
Dec 17th 2007, 07:33 AM
Details:
The stop maneuver for GOES-12 was performed this morning. GOES-12 is
currently in INR recovery and is operating on the following schedule:
>From 1315 UTC through 2044 UTC -- GOES-12 Post Maneuver Recovery Including:
* Full Disk Images (19 minute scan) at XX15 and XX45
* CONUS Soundings at XX46
2045 UTC December 17 -- GOES-12 Routine Scan Operations Resume
OSDPD plans to switch GOES-East operations (GINI/NOAAPORT and Products)
from GOES-10 back to GOES-12 beginning 1700 UTC. GOES-12 will still be
operating on the INR schedule (above) until 2045 UTC. Upon verification
of product processing, GOES-10 will be released back to GOES-South
America operations.
The stop maneuver for GOES-12 was performed this morning. GOES-12 is
currently in INR recovery and is operating on the following schedule:
>From 1315 UTC through 2044 UTC -- GOES-12 Post Maneuver Recovery Including:
* Full Disk Images (19 minute scan) at XX15 and XX45
* CONUS Soundings at XX46
2045 UTC December 17 -- GOES-12 Routine Scan Operations Resume
OSDPD plans to switch GOES-East operations (GINI/NOAAPORT and Products)
from GOES-10 back to GOES-12 beginning 1700 UTC. GOES-12 will still be
operating on the INR schedule (above) until 2045 UTC. Upon verification
of product processing, GOES-10 will be released back to GOES-South
America operations.